Contract Appointment

It's been a while since the contract appointment, I've been avoiding writing this post because by now I'm completely drained and lack the motivation I had at the start of this journey. The excitement has been replaced with anxiety and annoyance and I really hope that once we start the actual build (some where around the time where flying cars will be a household item, or so it seems) I'll get my super happy super excited self back. *End of rant lets get down to business*.......

The contract is basically the same as the tender only scarier because you feel like once you sign this then that's it, you can't negotiate, you can't notice mistakes and you'd have to live with it for the rest of your life- Not really! they later just send you a post contract variations and if there is a difference in price then the last payment you make will be reduced. They made a bunch of mistakes with our contract, like Kitchen culture added a panel for an integrated dishwasher we only said we are considering and never actually said we will be taking (that's an $800 mistake), I negated some of the services they were charging us and our BC went away and came back with a $500 refund for services. The worst bit was seeing a new drawing of our setback at 8.5 meters, we asked for a 4m setback at tender and they just made the 8.5m drawing to show us what might be the worst case scenario once council gets back to us about the set back, I didn't even want to sign it because I was paranoid that they'd accidentally send this atrocity to the council instead of the 4m setback drawing, so they replaced the drawing for us to the 4m we had at tender to sign on :)
My husband couldn't come to the appointment so I received everything to take home and have him sign and send to PD later so I had a week to sit and read the whole thing ten times before signing.

I also noticed a high quote from Kitchen culture for our extended benchtop to the window because we took a window all the way down to the benchtop to create a seamless look to the outside alfresco, at our KC appointment they said it will be a couple hundred $$ and it came back as almost $500, the dimensions on the KC doc says "Window Reveal is approx 2370 by 300" now 300 is the width of the whole wall and I doubt that the benchtop is supposed to go all the way to the outside of the house, but should stop once it hits the window glass so it should be about half of it so I am trying to get them to recalculate it, it's a bit of an annoyance because after the Wos appointment you basically correspond with your bc about everything and she obviously doesn't know about KC calculations so it's such a hassle getting things changed. Did anyone do a similar thing? could you please let me know what dimensions are written on your KC quote for that tiny bit of benchtop?


Now for some good news- we had Powercor get back to us about the electricity pit and we were looking at around 6k for the pit as this is what many people who had to do it through powercor were quoted and we were quoted $0 yep 0!! did not really get why but THANK YOU POWERCOR!!!!!!!! so we accepted the $0 quote (you can't really negotiate these numbers lol) and they said they will place the pit within 20 days. :) O-M-G~~~

*UPDATE: I talked to KC and she did measure the whole wall and said she will take it down from 300mm to 240mm, still sounds like more than what it will actually be, this is almost $100 difference which is not much but it's the principle of it that annoys me- you can't charge for what you're not going to sale!  